Well, the camera broke, but everything else is going fantastic - just not a lot of time to say what's going on; here are some pics.
The floor was insulated with 4" of foam core, then covered with 3/4" tongue and groove ply.
First wall was the hardest, second piece begins to fall in place, then you get the idea... all done in one day,plus a little grooming of the land.
For some reason, I thought it would be a good idea to build each frame on top of each other and simply lean the first one over to land directly in place.
Yeah, right.
# one big lesson so far is that sitting in front of a computer designing my baby dream cabin and building one are two VERY different things!
I ended up having to pull each nailed frame off the platform and gingerly slide them into place.